Team Civil was engaged by Leeds to fabricate, supply, install and conduct construction verification of cathodic protection test points along the MSCL pipeline (44km pipeline alignment) for the MSCL water main pipeline in BHP’s borefields.
Team Civil was engaged by Leeds to fabricate, supply, install and conduct construction verification of cathodic protection test points along the MSCL pipeline (44km pipeline alignment) for the MSCL water main pipeline in BHP’s borefields.
The works associated with the M6 Sectional Replacement works included the following, but not limited to: