As part of the construction of the Oaklands Rail Crossing by Department for Transport Energy & Infrastructure, SA Water’s DN80-Dn100 water main was relocated and new cathodic protection installed to provide protection. Team Civil was engaged to install cathodic protection along the pipeline alignment, ie. installation of insulated joints, bond cables, etc. and confirm the system was operational.