Team Civil was engaged to reduce water quality risks at 8 sites located in metropolitan/regional areas with sites that had raw interfaces (interface between potable/non-potable water) through installation of new valves and pipes.
Team Civil was engaged to reduce water quality risks at 8 sites located in metropolitan/regional areas with sites that had raw interfaces (interface between potable/non-potable water) through installation of new valves and pipes.
The works associated with the Raw Water Interfaces works included the following, but not limited to:
Provision of all Quality documentation associated with the works including the following: