TPW20-0224 Wattle Avenue, Hove

Project type
Pipeline
Client
SA Water
Date Complete
December, 2021
Location
Wattle Avenue, Hove

TPW20-0224 Wattle Avenue, Hove

Team Civil engaged as part of a SA Water fast-tracked program requiring works to be completed as soon as possible.

Scope of works performed:

The works associated with Bridge Road, Payneham works included the following, but not limited to:

  • Team Civil engaged as part of a SA Water fast-tracked program requiring works to be completed as soon as possible.
  • Advance notice of works provided to nearby properties (SA Water Customers).
  • Liaison with Allwater for the shutdown of water mains.
  • Notice was given to Allwater 10 working days prior to construction.
  • Liaison with the onsite contractor, Beltrame Civil, including providing them with TMPs, safety documentation, return to work and insurances for their review.
  • Traffic management only for stage 1, the contractor will be able to utilise Beltrame Civil traffic management set up for stage 2.
  • (Stage 1) Cut & cap main existing 80/100 CICL water main and install a temporary water connection.
  • (Stage 2) Install 27.5m of DN 100 PVC water main, including 2 x Fire Plugs, 1 x Stop Valve and 1 new water connection.
  • Hand chlorination of new water main and fittings.
  • As part of the commissioning process Team Civil conducted a hydro test on the completed pipeline to ensure the newly installed water mains would conform to the design specification.
  • Supply of all materials & traffic management.
  • Updated supplied CAD drawings of as-constructed works.