TPW21-0232 Glenthorne Park

Project type
Pipeline
Client
SA Water
Date Complete
December, 2021
Location
Glenthorne National Park

project intro goes here

Department for Environment and Water requested from SA Water that the existing water main be modified to accommodate the change in stormwater infrastructure within Glenthorne National Park. Prior to constructing the new stormwater infrastructure Team Civil successfully installed a dog leg in the water main.

 

Scope of works performed:

The works associated with Bridge Road, Payneham works included the following, but not limited to:

  • Team Civil engaged as part of a SA Water to provide alterations to existing SA Water assets to accommodate proposed stormwater works at Glenthorne National Park, O’Halloran Hill.
  • Advance notice of works provided to nearby properties (SA Water Customers).
  • Construct 9.10m x 100mm PE Dogleg to be lowered by 750mm.
  • Conduct compaction testing.
  • Maintain service to the customers during the changeover.
  • Supply of all materials & traffic management.
  • Updated supplied CAD drawings to as constructed status