QPE – Matson Court, Gillman Earthworks

Project type
Road & Earthworks
Client
QPE Advanced Machining
Date Complete
June, 2025
Location
Matson Court, Gillman SA

QPE - Matson Court, Gillman Earthworks

The project involved stripping of the existing ground surface and disposing of all removed materials offsite. A new rubble access track was constructed, which was supplied, placed, and compacted to the specified requirements. The new surface was graded to fall away from the existing building to ensure effective drainage.

 

Scope of works performed:

Team Civil was engaged to conduct the following:

  • Stripped approximately 100 mm of the existing ground surface and disposed of all materials offsite.
  • Removed all bitumen within the project area (maximum thickness ≈ 50 mm) and transported materials offsite.
  • Constructed a new rubble access track using 150 mm of PM2/20 RG material, supplied, placed, and compacted to specification.
  • Prepared the base by boxing out unsuitable materials and disposing of them offsite.
  • Supplied, placed, and compacted a 150 mm PM2/20 RG base course.
  • Graded the new surface to fall away from the existing building to ensure effective drainage.
  • Completed final trim works to achieve design levels and finish.
  • Early removal of unsuitable materials reduced rework and led to improved base compaction, while optimised grading enhanced site drainage and reduced future maintenance requirements.