Team Civil was engaged to reduce water quality risks at 8 sites located in metropolitan/regional areas with sites that had raw interfaces (interface between potable/non-potable water) through installation of new valves and pipes.
Scope of works performed:
The works associated with the Raw Water Interfaces works included the following, but not limited to:
Development and implementation of a project management plan, SWMS & JSEA’s.
Development of design and scope of works for some sites.
Submission of sketches/drawings to SA Water for approval prior to construction.
Commissioning of pipelines.
Services locating (including SA Water services).
Working in Railway Corridor.
Working in wastewater treatment plants with COVID-19 restrictions.
Provision of all Quality documentation associated with the works including the following:
Inspection and Test Plans and checklists.
Calibration certificates for torque tools.
Submission of as-constructed drawings.
Materials certificates.
Completed QA documentation supplied in electronic format to SA Water.