Team Civil was engaged to install a dogleg water main in the Seaview Road alignment, as night works on behalf of SA Water. Ahead of the scheduled works, Team Civil suggested modifications to the dogleg which improved safety of the work crew by reducing the need for the installation of shore boxes and allowed the dogleg pipeline to be constructed in two sections in the workshop, including Denso wrapping of the joints. By delivering the pipeline to site in pre-constructed sections, with no shore boxes, the works was completed in one night instead of the two nights which limited the impact on the local residents and businesses in the area.