Team Civil engaged as part of a SA Water fast-tracked program requiring works to be completed as soon as possible.
Scope of works performed:
The works associated with Bridge Road, Payneham works included the following, but not limited to:
Team Civil engaged as part of a SA Water fast-tracked program requiring works to be completed as soon as possible.
Advance notice of works provided to nearby properties (SA Water Customers).
Liaison with Allwater for the shutdown of water mains.
Notice was given to Allwater 10 working days prior to construction.
Liaison with the onsite contractor, Beltrame Civil, including providing them with TMPs, safety documentation, return to work and insurances for their review.
Traffic management only for stage 1, the contractor will be able to utilise Beltrame Civil traffic management set up for stage 2.
(Stage 1) Cut & cap main existing 80/100 CICL water main and install a temporary water connection.
(Stage 2) Install 27.5m of DN 100 PVC water main, including 2 x Fire Plugs, 1 x Stop Valve and 1 new water connection.
Hand chlorination of new water main and fittings.
As part of the commissioning process Team Civil conducted a hydro test on the completed pipeline to ensure the newly installed water mains would conform to the design specification.
Supply of all materials & traffic management.
Updated supplied CAD drawings of as-constructed works.