Wastewater Pump Station (WWPS) Upgrade Civil Works - Switchboard Slabs

Team Civil have established a dedicated work crew that work within established SA Water wastewater sites and upgrade the existing services to current standards. The success of this project is ongoing as to date we have completed 20 wastewater switchboard sites that are located within the Adelaide metropolitan area and in regional centers.

Scope of works performed:

Scope of works performed on Wastewater Pump Station (WWPS) Upgrade Civil Works – Switchboard Slabs were as follows:

  • Multiple locations around South Australia.
  • Concrete plinths for switchboards, wet wells and aprons.
  • Installed new switchboards and wet wells cabinets on the concrete slabs.
  • Coring of the existing switchboard plinth for new conduits.
  • Trenching and laying and supply of conduits.
  • Install rope pulls for SA Water electrical team.
  • Reinstatement of any concrete/paving removed altered for civil works.
  • Provision of support documentation in line with WHS requirements such as but not limited to Inductions, DBYDs and SWMS/JSEA’s.
  • Traffic management if required.
  • Provision of all Quality documentation associated with the works including the following:
    o Inspection and test plans.
    o Reinforcement schedule for the concrete slabs.
    o Materials certificates for backfill and concrete.
    o Submission of as-constructed drawings.